EV Charger Installation
Home charging should be sized around the property, the vehicle and the electrical installation — not just the charger nameplate.

Start with the existing electrical installation
An EV charger adds a substantial continuous load. Before installation, the existing supply, switchboard, circuit protection and maximum demand need to be considered so the charging arrangement suits the property.
32 A single-phase charging
From 1 October 2026, Ergon Energy withdrew the previous active-management requirement that applied to a single-phase 32 A EV charger under the referenced QECM clause. That does not remove the need to recalculate maximum demand or address supply and protection limitations.
What we can look at
- Preferred charger location and cable route.
- Existing switchboard condition and available capacity.
- Maximum demand and potential load constraints.
- Dedicated circuit and required protection.
- Whether a network application, supply change or alternative charging strategy needs consideration.
Official information
For the current network position, see Ergon Energy’s Electrical Partners Alert covering the withdrawal of QECM clause 8.14.4(b).
Need this assessed at your property?
Send through the suburb and a short description of what you have or what you want to achieve.