Electrical services
Generator & Backup Power Connections
Backup power only works properly when the changeover arrangement, earthing, protection and intended loads are considered as one system.

Plan the loads before the hardware
The useful question is not just “what size generator?” but which loads need to operate during an outage and how they will be transferred safely.
Typical work
- Dedicated generator inlet connection.
- Changeover arrangements suited to the installation.
- Assessment of essential versus non-essential loads.
- Switchboard changes needed to support the backup arrangement.
- Practical operating information for the client.
Site-specific design matters: generator arrangements vary significantly between installations. Existing earthing, supply configuration, inverter systems and connected loads can change the correct solution.
Need this assessed at your property?
Send through the suburb and a short description of what you have or what you want to achieve.
